AIRSEARCH™

Universal Intelligence Search

Ask questions of every parcel, building, air right, regulation, project, document, sensor and simulation across AIREx. Every answer ships with evidence, uncertainty and next steps.

Index healthy2.14B entities · 84.2M docs · sync 42s
Try:
Scope: Bay Area · 9 countiesTypes: parcels, buildings, air rightsTimeframe: rolling 90d + forward 12moConfidence ≥ 0.60
8 results · query "Which buildings within 1 mile of SFO have unused air rights abov" · 412 ms · federated over 12 indexes
Sort
Parcelsmatch 0.97conf 0.91opp 88PCL-06075-0140-042
155 Bryant St · APN 3773-020
SoMa · San Francisco · Zoning MUR-90 (MUR-140 pending)

43,120 sf lot · existing 68 ft envelope · 22,000 sf unused air rights identified · adjacent 165 Bryant TDR available at $418/sf. Falls under FAA Part 77 notification surface for SFO Runway 28L (approach ~168 ft AGL).

Sources:SF AssessorSF PlanningFAA OE/AAAAIRGRAPHupdated 12m ago
Buildingsmatch 0.93conf 0.86opp 82BLD-SF-0442
165 Bryant · 6-story office (1978)
68 ft AGL · Class B · 84,120 sf gross · owner: 165 Bryant Holdings, LLC

Structural drawings indicate frame capacity to +8 stories. 22,000 sf transferable air rights on record. Broker rep offer 2026-07-22 at $9.2M ($418/sf). PG&E 12kV service adequate to base only; upgrade required for vertical add.

Sources:SF DBIStructural report 2022TDR registryupdated 1h ago
Air Rightsmatch 0.90conf 0.83opp 84AIR-06075-A0088
22,000 sf transferable development rights · 165 Bryant
Transferable to receiving parcels within SoMa TDR district

TDR eligibility confirmed under Planning Code §128; recorded 2019. Two comparable transfers in trailing 24 mo (median $445/sf). No liens or restrictive covenants on record. FAA envelope permits transfer up to 168 ft AGL at 155 Bryant.

Sources:SF RecorderTDR registryTitle report (Fidelity)updated 3h ago
FAAmatch 0.87conf 0.78FAA-OE-2026-14204
Proposed Part 77 amendment · SFO Runway 28L approach surface
Notice window closes 2026-09-14 · affects 84 parcels in SoMa

FAA proposes lowering the transitional surface slope from 7:1 to 6.5:1 in SoMa quadrant. Preliminary raytrace: 12 parcels lose ≤ 4 ft envelope; 3 parcels lose 8-12 ft. 155 Bryant remains cleared to 168 ft AGL.

Sources:FAA docket 2026-14204AIRSIM raytrace SIM-2026-04412updated 5h ago
Regulationsmatch 0.85conf 0.80REG-SF-MUR-140
MUR-140 upzoning proposal · SoMa district
SF Planning Commission · comment window closes 2026-09-30

Increases base height from 90 ft to 140 ft on 41 parcels; adds inclusionary requirement of 22%. Portfolio uplift estimate +$68M NPV across 11 owned parcels; net of inclusionary cost still positive on 9 of 11.

Sources:SF Planning packet Aug-2026AIRSIM sensitivityupdated 7h ago
Permitsmatch 0.82conf 0.85PRM-SF-2026-1204
PRJ-0389 Mission Rock A · Site permit review · 184 days open
SF Planning + DBI + SFPUC · phase: coord review

18 comments cleared; 4 open (shadow analysis, transportation demand, storm water, mechanical). AI estimates 42-60 days to approval given reviewer velocity. Delay driver: shadow envelope study over Yerba Buena.

Sources:SF PIM portalAIRPERMIT trackerupdated 9h ago
Ownersmatch 0.78conf 0.74OWN-LLC-165BRY
165 Bryant Holdings, LLC
DE LLC · sole member: Bryant Family Trust (2004) · counsel: Farella

Portfolio: 3 SoMa properties, 84,120 sf combined. Broker relationships: Newmark. Historic transactions: acquired 165 Bryant 2019 ($68M). Prior TDR seller: yes (2 records).

Sources:DE SoSSF RecorderCRE transaction DBupdated 1d ago
Simulationsmatch 0.76conf 0.78SIM-2026-04412
AIRSIM · 5-scenario cascade for 155 Bryant +4 stories
Best/Expected/Conservative/Worst/Custom · conf 0.78

Expected IRR 17.4%, NPV $38.9M (10y hold). Cascade layers: FAA clearance ✓ · PG&E 4MW upgrade required · shadow study neutral · CEQA screening scoped. Locked twin: as-of 2026-07-27.

Sources:AIRSIM engineAIRCORE twin snapshotupdated 2d ago
Informational only. AIRSEARCH synthesises AI-generated answers from federated sources across AIREx. Every result — including confidence, evidence and inferred conclusions — is informational and requires professional verification before use in filings, transactions or engineering decisions.